General Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 | | PASS |
Andy J. Long
|
|
|
Dropzone Subdivision development under this permit is complete. All roads, utilities, and stormwater drainage system is installed. Open lots are adequately vegetated with various grasses and weeds.
Associated CGP eNOIs have been terminated (IDR12CI63,IDR12CI88) with a new permit open for the multiple SFHs being built by CBH. These homes have seperate ESC permits that are issued.
ESC conditions satisfied for this permit.
|
DOC - Permit Finaled | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/30/2014 | 10/30/2014 | 10/30/2014 | | PASS |
Andy J. Long
|
|
|
Work on individual homes has started in Dropzone sub. No further subdivision development construction. Open areas not yet stabilized/vegetated. No coorections required.
|
General Inspection | 9/29/2014 | 9/29/2014 | 9/29/2014 | | PASS |
Evan Jenkins
|
|
|
Site Fully Vegetated, but will keep permit open until more homes are built/under construction
|
General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 | | PASS |
Andy J. Long
|
|
|
No trackout to streets. Some landscaping in place. 2 SFHs in progress. No corrections at this time. Stormwater drainage system is self contained and inlets have protection.
|
General Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 | | PASS |
Evan Jenkins
|
|
|
the site is very clean and in great shape no esc issues
|
General Inspection | 6/26/2014 | 6/26/2014 | 6/26/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues. site is very clean
|
General Inspection | 5/26/2014 | 5/26/2014 | 5/28/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 | | PASS |
Andy J. Long
|
|
|
Streets are clear. Some work on subdivision playground in progress. No corrections at this time.
|
General Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues at time of inspection
|
General Inspection | 2/20/2014 | 2/20/2014 | 2/20/2014 | | PART |
Evan Jenkins
|
|
|
Trackout coming off a few lots, Drop Inlet BMP maintenance required throughout site. Access road where it appears the public as driven through mulitiple times, and also through the adjacent lot causing trackout down Ardyce all the way to Cloverdale. Contacted Mr. Conger to disclose the issues, and he stated he will get on it right away today
|
General Inspection | 1/20/2014 | 1/20/2014 | 1/20/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 12/20/2013 | 12/20/2013 | 12/20/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/19/2013 | 11/19/2013 | 11/19/2013 | | PASS |
Andy J. Long
|
|
|
Subdivision streets have been laid, some utility work is ongoing. Stormwater structures have protection, very flat terrain. No track out issues. Vertical construction has not yet began. Approved.
|
General Inspection | 10/18/2013 | 10/18/2013 | 10/18/2013 | | PART |
Evan Jenkins
|
|
|
Contact info needs to be re-written on Yellow Construction SIgn near entrance
|
General Inspection | 9/17/2013 | 9/17/2013 | 9/18/2013 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 8/14/2013 | 8/14/2013 | 8/16/2013 | | PASS |
Daryl DeGrange
|
|
|
|
General Inspection | 7/10/2013 | 7/10/2013 | 7/10/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 5/3/2013 | 5/3/2013 | 5/3/2013 | | PASS |
Clint A Smith
|
|
|
|