Permit NumberESC13-00323
StatusFinaled
Name JIM CONGER
Site Address 2700 N CLOVERDALE RD
Project NameDROPZONE SUBDIVISION
Customer Number 
ePlanReviewNo
Description
Subdivision
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/1/201412/1/201412/1/2014 PASS
DetailsAndy J. Long
Dropzone Subdivision development under this permit is complete. All roads, utilities, and stormwater drainage system is installed. Open lots are adequately vegetated with various grasses and weeds.

Associated CGP eNOIs have been terminated (IDR12CI63,IDR12CI88) with a new permit open for the multiple SFHs being built by CBH. These homes have seperate ESC permits that are issued.

ESC conditions satisfied for this permit.
DOC - Permit Finaled12/1/201412/1/201412/1/2014PPASS
DetailsAndy J. Long
General Inspection10/30/201410/30/201410/30/2014 PASS
DetailsAndy J. Long
Work on individual homes has started in Dropzone sub. No further subdivision development construction. Open areas not yet stabilized/vegetated. No coorections required.
General Inspection9/29/20149/29/20149/29/2014 PASS
DetailsEvan Jenkins
Site Fully Vegetated, but will keep permit open until more homes are built/under construction
General Inspection8/28/20148/28/20148/28/2014 PASS
DetailsAndy J. Long
No trackout to streets. Some landscaping in place. 2 SFHs in progress. No corrections at this time. Stormwater drainage system is self contained and inlets have protection.
General Inspection7/28/20147/28/20147/28/2014 PASS
DetailsEvan Jenkins
the site is very clean and in great shape
no esc issues
General Inspection6/26/20146/26/20146/26/2014 PASS
DetailsEvan Jenkins
no esc issues.
site is very clean
General Inspection5/26/20145/26/20145/28/2014 CANC
DetailsEvan Jenkins
holiday
General Inspection4/24/20144/24/20144/24/2014 PASS
DetailsAndy J. Long
Streets are clear. Some work on subdivision playground in progress. No corrections at this time.
General Inspection3/24/20143/24/20143/24/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection2/20/20142/20/20142/20/2014 PART
DetailsEvan Jenkins
Trackout coming off a few lots, Drop Inlet BMP maintenance required throughout site. Access road where it appears the public as driven through mulitiple times, and also through the adjacent lot causing trackout down Ardyce all the way to Cloverdale. Contacted Mr. Conger to disclose the issues, and he stated he will get on it right away today
General Inspection1/20/20141/20/20141/20/2014 CANC
DetailsEvan Jenkins
holiday
General Inspection12/20/201312/20/201312/20/2013 PASS
DetailsAndy J. Long
General Inspection11/19/201311/19/201311/19/2013 PASS
DetailsAndy J. Long
Subdivision streets have been laid, some utility work is ongoing. Stormwater structures have protection, very flat terrain. No track out issues. Vertical construction has not yet began. Approved.
General Inspection10/18/201310/18/201310/18/2013 PART
DetailsEvan Jenkins
Contact info needs to be re-written on Yellow Construction SIgn near entrance
General Inspection9/17/20139/17/20139/18/2013 PASS
DetailsJim Johnson
General Inspection8/14/20138/14/20138/16/2013 PASS
DetailsDaryl DeGrange
General Inspection7/10/20137/10/20137/10/2013 PASS
DetailsClint A Smith
General Inspection6/5/20136/5/20136/5/2013 DONE
DetailsClint A Smith
No activity
General Inspection5/3/20135/3/20135/3/2013 PASS
DetailsClint A Smith