General Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PASS |
Andy J. Long
|
|
|
Big Juds new building is complete. Stormwater structures and sod has been laid. ESC conditions satisfied.
|
General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 | | PART |
Evan Jenkins
|
|
|
Verbal Correction Notice to RP: Met with RP onsite. Sweep curb/gutter/sidewalk and parking lot before end of day. Will reinspect tomorrow 11-13-13. RP stated he will, and they will be finished by end of day
|
General Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | | PASS |
Andy J. Long
|
|
|
|
BMP Violation | 8/6/2013 | 8/7/2013 | 8/7/2013 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 8/2/2013 | 8/2/2013 | 8/6/2013 | | FAIL |
Eric Strole
|
|
|
Left verbal with RP to post ESC sign , clean up all dirt and debris off all hard surfaces and clean ou all concrete that was washed out on the ground. Have complete by 8-7-13 am. Will reinspect on 8-7-13 pm.
|
Site Preparation | 6/17/2013 | 6/17/2013 | 6/17/2013 | | NR |
Clint A Smith
|
|
|
Area fenced off with a construction trailer located within the fence. No activity yet.
|