General Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | | PASS |
Andy J. Long
|
|
|
Warehouse and hangar construction is complete, all utility and parking areas are stabilized/paved. Landscaping along Aeronica complete and temp BMPs removed. ESC permit finaled.
|
DOC - Permit Finaled | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/8/2014 | 9/8/2014 | 9/8/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues
|
General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 | | PASS |
Andy J. Long
|
|
|
Warehouse is erected and work on interior and some areas of exterior are in progress. No corrections at this time.
|
General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress on hangar. Multiple ESC permits at this site. See also ESC13-00892. No corrections required. No trackout to Aeronica. Permit posted in job trailer.
|
General Inspection | 3/3/2014 | 3/3/2014 | 3/3/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/31/2013 | 12/31/2013 | 12/31/2013 | | PART |
Andy J. Long
|
|
|
Need to restore construction entrance. Verbal correction given to RP Mark. No other BMP violations observed.
|
General Inspection | 10/30/2013 | 10/30/2013 | 10/30/2013 | | PASS |
Evan Jenkins
|
|
|
|