General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 | | PASS |
Andy J. Long
|
|
|
Finalized.
|
DOC - Permit Finaled | 5/5/2014 | 5/5/2014 | 5/5/2014 | P | PASS |
Andy J. Long
|
|
|
Tennis courts are complete. All construction materials removed from site and temporary BMPs. Disturbed grass area has reseeded and established. ESC permit conditions satisfied.
|
General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 | | PASS |
Andy J. Long
|
|
|
Grass field adajecent to courts is establishing itself. No corrections required.
|
General Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | | PASS |
Andy J. Long
|
|
|
STaging area is still in process of stabilization and is fence off. Tennis courts almost complete. No activity at time of inspection but looks like the are placing curbing around edge of courts. No corrections required.
|
General Inspection | 12/16/2013 | 12/16/2013 | 12/19/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 10/30/2013 | 10/30/2013 | 10/30/2013 | | PASS |
Andy J. Long
|
|
|
New tennis courts have been installed. Adjacent field is currently being stabilized with grass. No track out or other violations.
|
General Inspection | 9/11/2013 | 9/11/2013 | 9/11/2013 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 7/26/2013 | 7/26/2013 | 7/26/2013 | | PART |
Kimberly M. Johnson
|
|
|
Walked project with Chris Sheppard with Diamond Contractors. DI protection in place. Concrete washouts from previous pour were not sized appropriatly and resulted in spillage on ground and gutter. Discussed requirement to control all washouts for next pour; only have sidewalks left to do. Topsoil stockpile has been hauled out and is now inactive. Must stabilize this area within 14 days of inactivity. Notified Chris of this requirement. Will re-inspect in 14 days.
|
General Inspection | 6/5/2013 | 6/5/2013 | 6/5/2013 | | NR |
Clint A Smith
|
|
|
|