Site Final | 11/20/2013 | 11/21/2013 | 11/21/2013 | A | PASS |
Andy J. Long
|
|
|
DARREN Phone #: ###-####
Finaled.
|
DOC - Permit Finaled | 11/21/2013 | 11/21/2013 | 11/21/2013 | P | PASS |
Andy J. Long
|
|
|
ESC conditions met.
|
General Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Parking lot stromwater structures have DI protection. No corrections at this time.
|
General Inspection | 9/18/2013 | 9/18/2013 | 9/24/2013 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 8/2/2013 | 8/2/2013 | 8/6/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
Site Preparation | 6/17/2013 | 6/17/2013 | 6/19/2013 | | PASS |
Clint A Smith
|
|
|
|