General Inspection | 1/6/2014 | 1/6/2014 | 1/6/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PASS |
Andy J. Long
|
|
|
Jackson's is complete with all curbing and landscaping installed. Site is clean with no construction materials. BMPs removed. BLD permit finaled.
|
General Inspection | 11/19/2013 | 11/19/2013 | 11/19/2013 | | PASS |
Andy J. Long
|
|
|
Some minor construction on-going on gas pump area, most of project is complete. Concrete pad and landscaping is installed. No track out or stockpiles remaining. Approved. Can be finaled when BLD permit is finaled.
|
General Inspection | 10/1/2013 | 10/1/2013 | 10/1/2013 | | PASS |
Andy J. Long
|
|
|
BMPs installed and permit posted. Some track out from active landscapig (Hoffman). Told RP to have them sweep up any track out.
|
General Inspection | 8/16/2013 | 8/16/2013 | 8/16/2013 | | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 6/27/2013 | 7/1/2013 | 7/1/2013 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/26/2013 | 6/27/2013 | 6/28/2013 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP; Reinstall sediment barriers along the north east perimeter per the industry standards. Will re-inspect on 7/1/2013
|