General Inspection | 2/3/2014 | 2/3/2014 | 2/3/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 2/3/2014 | 2/3/2014 | 2/3/2014 | P | PASS |
Evan Jenkins
|
|
|
Complete No Constcution occuring. Vegetation Re-established
|
General Inspection | 12/3/2013 | 12/3/2013 | 12/3/2013 | | PASS |
Evan Jenkins
|
|
|
waiting for BLD signoff construction appears complete, but don't see any BLD inspections have been performed No ESC Issues
|
General Inspection | 10/2/2013 | 10/2/2013 | 10/2/2013 | | PASS |
Andy J. Long
|
|
|
Sign has been moved back from road and landscaping stabilized around the sign. Road work on 30th Street extension is on going and other permits not finaled so permit remains active.
|
General Inspection | 8/2/2013 | 8/2/2013 | 8/6/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
General Inspection | 5/29/2013 | 5/29/2013 | 5/29/2013 | | PASS |
Clint A Smith
|
|
|
|