DOC - Permit Finaled | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Andy J. Long
|
|
|
House complete and landscaped. Rear silt fence removed. ESC permit conditions satisfied.
|
General Inspection | 4/14/2014 | 4/14/2014 | 4/14/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/13/2014 | 3/13/2014 | 3/13/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/10/2014 | 2/10/2014 | 2/10/2014 | | PASS |
Evan Jenkins
|
|
|
No Issues at time of inspection
|
General Inspection | 1/9/2014 | 1/9/2014 | 1/9/2014 | | PASS |
Andy J. Long
|
|
|
No exterior construction activity or earthwork observed. There are ACHD Boise Ave road stockpiles in front of site at this time- not associated with house project. No corrections required.
|
General Inspection | 12/9/2013 | 12/9/2013 | 12/9/2013 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 | | PASS |
Andy J. Long
|
|
|
WIP. Silt fence along back is still in place. No corrections at this time.
|
Site Preparation | 10/4/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Evan Jenkins
|
|
|
Kristy Phone #: ###-#### Gater Guard Waddles in Place. Silt Fence being installed now
|