General Inspection | 11/1/2013 | 11/1/2013 | 11/1/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 11/1/2013 | 11/1/2013 | 11/1/2013 | P | PASS |
Andy J. Long
|
|
|
House is complete, landscaped and stabilized. Slope behind house is stabilized with tacifyer. No corrections necessary, conditions met.
|
General Inspection | 10/1/2013 | 10/1/2013 | 10/1/2013 | | PASS |
Andy J. Long
|
|
|
BMPs installed, permit posted, no track out. Approved.
|
General Inspection | 8/30/2013 | 8/30/2013 | 9/3/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 7/12/2013 | 7/12/2013 | 7/12/2013 | | PEND |
Clint A Smith
|
|
|
|
General Inspection | 6/6/2013 | 6/10/2013 | 6/10/2013 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/6/2013 | 6/6/2013 | 6/6/2013 | | FAIL |
Clint A Smith
|
|
|
Message to RP; CLean up all hard sufaces of all sediment and debris. Will re-inspect on 6/10/2013
|