General Inspection | 10/1/2013 | 10/1/2013 | 10/1/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | PASS |
Andy J. Long
|
|
|
Site stabilzation and landscaping is complete. Construction is finished and no violations. DI protection in good condition and other contsruction is on going in Elevation Ridge subdivision.
|
General Inspection | 8/30/2013 | 8/30/2013 | 8/30/2013 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 7/12/2013 | 7/12/2013 | 7/12/2013 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/24/2013 | 5/24/2013 | 5/24/2013 | | NR |
Clint A Smith
|
|
|
|