Permit Information
Permit NumberESC13-00471
StatusFinaled
Name ERIC ALLEN
Site Address 1200 E BOISE AVE
Project NameTianna Park Sub
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/27/201511/27/201511/27/2015APASS
DetailsChad Schwendiman
Aging Inspection11/2/201511/2/201511/2/2015 PASS
DetailsAndy J. Long
WIP on final homes in Tianna Park by Sunrise Homes (permitted seperately). No significant trackout. Trash and materials are contained on site, DI bag installed on Spinaker
Aging Inspection8/31/20158/31/20158/31/2015 PASS
DetailsAndy J. Long
2 SFHs in progress at Tianna Park by Sunrise Homes. No trackout or discharges, inactive/complete areas have had DI bags removed. 1 bag installed on Spinnaker where work is. Workers keeping clean, no trash or litter issues.

Will request that gatorguard wattles in stand windows be removed. Approved.
Aging Inspection6/29/20156/29/20156/29/2015 PASS
DetailsAndy J. Long
Aging Inspection4/27/20154/27/20154/27/2015 PASS
DetailsAndy J. Long
Aging Inspection2/23/20152/23/20152/23/2015 PASS
DetailsAndy J. Long
SFHs by Sunrise Homes in Tianna Park are in progress and individually permitted. Swale/sand window along Holden has been cleaned and parking next to it has been prohibitied. DI bag on Spinaker has remaining capacity. No trackout or discharges. No corrections at this time.
Aging Inspection12/22/201412/22/201412/22/2014 PASS
DetailsAndy J. Long
No new subdivision work in Tianna Park. Individual SFH in progress. Stormdrains have inlet protection, contractors parking on street and staying off mud. No trackout. Trash is contained.
No corrections required.
Aging Inspection10/20/201410/20/201410/20/2014 PASS
DetailsEvan Jenkins
computer malfunction. site looks pretty good. some little debris, but no trackout
Aging Inspection8/18/20148/18/20148/18/2014 FAIL
DetailsAndy J. Long
Swales are filled with sediment and debris. There has been no work done by JH development or Sunrise Development as stated. Will reinspect this week to issue corrections to individual SFH projects.
General Inspection6/16/20146/16/20146/16/2014 PASS
DetailsAndy J. Long
General Inspection4/14/20144/14/20144/14/2014 PASS
DetailsAndy J. Long
Open lots still remaining in Tianna Park. Rocky swales are surrounded by wattles/gatorguard. Minor trackout to subdivision access lanes but not to Holden.
General Inspection2/10/20142/10/20142/10/2014 FAIL
DetailsEvan Jenkins
Roofer is driving heavy exquiptment through the swales again, and also there is significant trackout of ACHD's ROW. Attempted to contact RP Justin w/ Sunrise homes and left VM to call me back and install a construction entrance ASAP.
General Inspection12/9/201312/9/201312/9/2013 PASS
DetailsEvan Jenkins
Stop Work Order10/7/201310/9/201310/9/2013AFAIL
DetailsEvan Jenkins
Stop Work Order Issued
Contacted Justin about BMP VIolations
He stated they will cleanup concrete, install construction entrance, install perimeter BMP's and Sweep Street; Phone #: Justin:###-####
BMP Violation10/9/201310/9/201310/9/2013PFAIL
DetailsEvan Jenkins
BMP's Not Intalled as Contractor stated verbally onsite on 10-7-13.
More construction took place during the stop work order.
Site Preparation10/7/201310/7/201310/7/2013AFAIL
DetailsEvan Jenkins
Stop Work Issued
BMP Violations
Scheduled Inspection for 10-9-13
Site Preparation6/13/20136/13/20136/13/2013 NR
DetailsClint A Smith
General Inspection8/30/20138/30/2013   
DetailsBill VanDegrift