DOC - Permit Finaled | 6/27/2014 | 6/27/2014 | 6/27/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/27/2014 | 6/27/2014 | 6/27/2014 | | PASS |
Andy J. Long
|
|
|
Union Square Phase II is complete. No further construction. All disturbed areas landscaped and stabilized including the temporary staging area across Smoke Ranch. ESC conditions satisfied.
|
General Inspection | 5/9/2014 | 5/12/2014 | 5/12/2014 | A | PASS |
Andy J. Long
|
|
|
BLD permit has been finaled. Some temporary BMPs are still in place as final landscaping is finishing up. Some construction materials still remain in the staging area as well. No trackout or other violations observed. Will check to see if any corrections/status on next general inspection.
|
General Inspection | 5/9/2014 | 5/9/2014 | 5/9/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for Monday 5/12
|
General Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | | PASS |
Evan Jenkins
|
|
|
no esc issues at time of inspection
|
General Inspection | 2/4/2014 | 2/4/2014 | 2/4/2014 | | PASS |
Andy J. Long
|
|
|
Road appears to be swept over weekend and construction entrance to staging area has new construction entrance. No corrections at this time. WIP.
|
Tracking Control | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | PEND |
Andy J. Long
|
|
|
Follow up inspection from CN issued in the A.M.
Corrections complete:
1. Sidewalk on Goldking swept and stockpile materials removed with blow torches to unmelts, shovels to scrape 2. Street sweeper deiced and swept Goldking 3. Stockpile of sand relocated 4. Gyp-crete spill on Goldking cleaned
Corrections in progress:
1. Trash pick up on site 2. Designated concrete washout
|
General Inspection | 12/20/2013 | 12/20/2013 | 12/20/2013 | | PART |
Andy J. Long
|
|
|
See ESC13-00482 for corrections on Union Square project. Clean up has been started.
|
General Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 | | PASS |
Andy J. Long
|
|
|
BMPs have been maintained in response to correction order on other Union Square project. Construction entrances have been reparied, perimeter access fencing installed to restrict unauthorized entrance/track out. New DI bags placed on all inlets.
|
General Inspection | 9/18/2013 | 9/18/2013 | 9/24/2013 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 8/2/2013 | 8/2/2013 | 8/6/2013 | | CANC |
Kimberly M. Johnson
|
|
|
|
Site Preparation | 6/14/2013 | 6/14/2013 | 6/14/2013 | P | PASS |
Kimberly M. Johnson
|
|
|
Construction access installation in process. No perimeter control required at this time per plan. RP to evaluate need during inspection. Inlet protection is in. Discussed soil type and extra precautions required for dust control, totes need to labeled. Discussed action items required to close out phase I permits. RP will issue permit modification for laydown yard on north side of smoke ranch drive
|