General Inspection | 6/19/2014 | 6/19/2014 | 6/19/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 6/19/2014 | 6/19/2014 | 6/19/2014 | P | PASS |
Evan Jenkins
|
|
|
Project Complete Vegetation Re-established via sod/landscaping no issues done
|
General Inspection | 5/19/2014 | 5/19/2014 | 5/19/2014 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 4/18/2014 | 4/18/2014 | 4/18/2014 | A | FAIL |
Andy J. Long
|
|
|
Verbal CN given to landscapers who are building berm along Windsong. Stockpile dumped on the sidewalk needs to be removed ASAP. Jason from Willowgreen Landscaping assured me the project has to be complete and will be cleaned.
|
General Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | | PASS |
Evan Jenkins
|
|
|
Same comments as below. No ESC Issues at time of inspection
|
General Inspection | 2/21/2014 | 2/21/2014 | 2/21/2014 | | PASS |
Andy J. Long
|
|
|
BLD permit has been finaled already and house appears to be occupied. Yard has not been stabilized, ESC permit is still posted and perimeter BMPs are still installed. Will continue to monitor until stabilization/landscaping is complete as well as the pool with seperate ESC permit. No corrections at this time.
|
General Inspection | 1/21/2014 | 1/21/2014 | 1/21/2014 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. Wattles installed along downslope perimeter. Yard is not yet landscaped/stabilized. Pool consruction on-going in backyard with seperate permit. No corrections at this time.
|
General Inspection | 12/20/2013 | 12/20/2013 | 12/20/2013 | | PASS |
Andy J. Long
|
|
|
Trackout cleaned. Clements on-site pouring concrete. Witnessed washout into pit across the street. Will need to be cleaned once solidified.
|
General Inspection | 11/19/2013 | 11/19/2013 | 11/19/2013 | | FAIL |
Andy J. Long
|
|
|
Track out leading down street from site - single tracks. Need to restrict access or provide a contstruction entrance if materials need to be delivered to site.
Called RP: Corrections - clean up track out on Travertine Provide construction entrance or restrict access.
|
General Inspection | 10/16/2013 | 10/16/2013 | 10/16/2013 | | PASS |
Andy J. Long
|
|
|
BMPs implemented and permit in place. Approved.
|
General Inspection | 9/13/2013 | 9/13/2013 | 9/13/2013 | | PASS |
Bill VanDegrift
|
|
|
|
General Inspection | 8/7/2013 | 8/7/2013 | 8/14/2013 | | PASS |
Eric Strole
|
|
|
|
BMP Violation | 6/14/2013 | 6/19/2013 | 6/20/2013 | A | FAIL |
Kimberly M. Johnson
|
|
|
ESC sign is up but no ESC BMPs have been installed. LM for RP. Dave Evans Construction changed RP to Zane. BMPs are scheduled to be installed Friday 6/21
|
Site Preparation | 6/14/2013 | 6/14/2013 | 6/14/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Spoke with RP: Install ESC sign and BMP measures per approved ESC plan.
|