General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Andy J. Long
|
|
|
Union Square phase II is complete, landscaped, and occupied. No further construction activity. ESC conditions satisfied.
|
General Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/4/2014 | 4/4/2014 | 4/4/2014 | | PASS |
Evan Jenkins
|
|
|
landscaping is currently underway. no esc issues at this time
|
General Inspection | 2/17/2014 | 2/17/2014 | 2/17/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 | | PART |
Andy J. Long
|
|
|
Site BMPs installed but still considerable track out onto Smoke Ranch. Contracted with PCS but trucks are currently out of service; parking lots are scheduled to be paved either next Mon/Tues (11/19) so should solve track out problem. New DI filter bags have been installed.
|
General Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | | FAIL |
Evan Jenkins
|
|
|
Correction Notice Issued: Install Construction Entrance, Maintain BMP's, Sweep Street, Sidewalk & Curb Post Construction Signage: EEJ Re-Inspection 9-25-13 pm.
|
General Inspection | 12/31/2013 | 12/31/2013 | | | |
Mike Jordan
|
|
|
|
General Inspection | 8/7/2013 | 8/7/2013 | | | |
Mike Jordan
|
|
|
|