Aging Inspection | 12/18/2013 | 12/18/2013 | 12/18/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/18/2013 | 12/18/2013 | 12/18/2013 | P | PASS |
Andy J. Long
|
|
|
Pioneer Corridor path is complete and stabilized with landscaping and grass. No construction materials remaining on site. No further ESC inspections required.
|
Site Preparation | 6/6/2013 | 6/6/2013 | 6/6/2013 | | PART |
Clint A Smith
|
|
|
Verbal to RP; Provides a washout prior to the placement of concrete. Also maintain a daily schedule of clean up of all sediment and debris out of the street and gutter pan.
|