General Inspection | 10/20/2015 | 10/20/2015 | 10/20/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
General Inspection | 9/4/2015 | 9/4/2015 | 9/4/2015 | | PEND |
Evan Jenkins
|
|
|
Remove Temp BMP's
|
General Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | PASS |
Evan Jenkins
|
|
|
Near Completion: no Issues at this time
|
General Inspection | 6/2/2015 | 6/2/2015 | 6/2/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues at this time. Project near completion
|
General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: paving is finished, contractors working on buildings. no ESC issues
|
General Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | | PASS |
Evan Jenkins
|
|
|
Work ongoing. no esc issues at this time
|
General Inspection | 1/13/2015 | 1/13/2015 | 1/13/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues
|
General Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 | | PASS |
Evan Jenkins
|
|
|
Computer issues: Inspection was conducted at 8:15am. Work in Progress. No ESC Issues
|
General Inspection | 10/10/2014 | 10/13/2014 | 10/13/2014 | A | PASS |
Evan Jenkins
|
|
|
No ESC issues. Site looks good with BMP's installed throughout site
|
General Inspection | 10/10/2014 | 10/10/2014 | 10/10/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for Monday 10/13
|
General Inspection | 8/25/2014 | 8/25/2014 | 8/25/2014 | | PASS |
Evan Jenkins
|
|
|
concrete washout has been cleaned out. silt fence still in good shape. no esc issues at this time
|
General Inspection | 7/8/2014 | 7/8/2014 | 7/8/2014 | | PASS |
Evan Jenkins
|
|
|
concrete washout is near its capacity and should be changed out/replaced
|
Random Inspection | 5/22/2014 | 5/22/2014 | 5/22/2014 | P | PASS |
Andy J. Long
|
|
|
Adequate washout capacity remaining on site. No trackout to new access road. Permit posted. No corrections at this time.
|
Random Inspection | 4/16/2014 | 4/16/2014 | 4/16/2014 | P | PART |
Andy J. Long
|
|
|
Main concrete washout is full. There are two auxilliary washouts available in the mean time, but the main washout needs maintenance. No other violations or issues. WIP.
|
Random Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | A | PASS |
Andy J. Long
|
|
|
WWTP Phosphorus plant is in progress. Building is primarily made of concrete, observed large capacity washout in use by concrete trucks. No trackout to access road or rest of plant. Approved.
|
Random Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Andy J. Long
|
|
|
Vertical construction of phosphorus plant is ongoing with crane on-site and cement work. Two large lined washout pits have been set up to the west of the building. No trackout; silt fence perimeter still in place. Approved.
|
Random Inspection | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | PASS |
Andy J. Long
|
|
|
Stockpiles contained within silt fence perimeter. No trackout to surrounding areas at WWTP observed and no track out to Joplin.
|
General Inspection | 12/10/2013 | 12/10/2013 | 12/13/2013 | | PASS |
Andy J. Long
|
|
|
WIP. Vertical construction has begun. No trackout. Perimeter BMPs installed.
|
Site Preparation | 10/10/2013 | 10/23/2013 | 10/23/2013 | A | PASS |
Andy J. Long
|
|
|
Check for BMP installation; Silt fence and site has been prepped as discussed in previous meeting. No corrections at this time. No activity at time of inspection.
|
General Inspection | 10/9/2013 | 10/9/2013 | 10/10/2013 | | PASS |
Andy J. Long
|
|
|
Had confence with RSCI project manager Cory Kessler (###-####) regarding site setup. Permit and plan are at job trailor. Construction will begin next week. Site is contained by new access (to be paved after completion of project) and will have silt fence along south and east to prevent runoff down to biosolids treatement pasture. Re-inspection of BMPs will occur next Wednesday. Approved.
|