General Inspection | 6/13/2014 | 6/13/2014 | 6/13/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Evan Jenkins
|
|
|
complete no esc issues
|
Site Final | 4/25/2014 | 4/28/2014 | 4/28/2014 | A | PEND |
Andy J. Long
|
|
|
Phone conversation with Ben Wolf (RP - Towercom Tech.) regarding loose dirt compacted outside of curbing. Sediment runoff into parking lot is originating from this area.
Issued verban CN over telephone to shovel and remove the loose dirt and sweep the sediment that has already migrated into lot. He agreed and said he send a crew to clean up today and would give me a call for the final. Also advised him to final the BLD permit if ready with Mike Jordan.
|
General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 | | FAIL |
Andy J. Long
|
|
|
Need to stabilize loose dirt patch that is causing sediment to run into parking lot. Also need to sweep parking spots directly in front of tower. Will contact RP Monday
|
General Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 | | PASS |
Andy J. Long
|
|
|
Cell tower and control building are complete on exterior. Some minor work still in progress.
|
General Inspection | 12/3/2013 | 12/3/2013 | 12/3/2013 | | PART |
Andy J. Long
|
|
|
No activity at time of inspection, project not yet complete.. Need to complete pavement in front of tower and remove excess dirt. Stabilize dirt to the north of tower. No trackout or other violations.
|
General Inspection | 10/16/2013 | 10/16/2013 | 10/16/2013 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 8/29/2013 | 8/29/2013 | 8/29/2013 | A | PART |
Mike Jordan
|
|
|
Needs to provide washout and bmp's for excavated soils.
|
General Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 | | CANC |
Alan Hauser
|
|
|
|
General Inspection | 1/21/2014 | 1/21/2014 | | | |
Mike Jordan
|
|
|
|