Site Final | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | DONE |
Evan Jenkins
|
|
|
Dan Appel Phone #: ###-#### >> Inspection requested via web by Daniel Appel SEE FINAL
|
DOC - Permit Finaled | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | PASS |
Evan Jenkins
|
|
|
complete
|
DOC - Permit Finaled | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | PASS |
Evan Jenkins
|
|
|
complete
|
Aging Inspection | 5/7/2014 | 5/7/2014 | 5/7/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 3/3/2014 | 3/4/2014 | 3/4/2014 | A | PASS |
Andy J. Long
|
|
|
Dan Appel Phone #: ###-#### >> Inspection requested via web by Daniel Appel
Site is ready for excavation. Temporary power pole now installed so Dan is posting permit. Subdivision is clean, no grade, downstream DI has protection. Informed Dan that is the open lot down the street is to be used for staging or stockpiling, a general ESC permit will need to be acquired. Approved.
|
Aging Inspection | 2/26/2014 | 2/26/2014 | 3/3/2014 | | CANC |
Evan Jenkins
|
|
|
ESC group out of town
|
Aging Inspection | 12/25/2013 | 12/25/2013 | 12/26/2013 | | CANC |
Evan Jenkins
|
|
|
Holiday
|