Site Final | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 11/27/2014 | 11/27/2014 | 11/28/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 10/27/2014 | 10/27/2014 | 10/27/2014 | | PASS |
Andy J. Long
|
|
|
Interior work ongoing at TV Hospital. No exterior earth disturbance; staging area and storage containers are located along back alley. No spills or other stormwater pollution sources observed. Approved.
|
General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | | PASS |
Andy J. Long
|
|
|
WIP on both phases, both ESC permits active. No further earth distubance and the addition is complete. Work is ongoing on the interior and the exterior is still being used for staging and job trailers.
|
General Inspection | 8/25/2014 | 8/25/2014 | 8/25/2014 | | PASS |
Andy J. Long
|
|
|
No further excavation/earth work. Interior work remaining. No violations observed. WIP.
|
General Inspection | 7/24/2014 | 7/24/2014 | 7/24/2014 | | PASS |
Evan Jenkins
|
|
|
work in progress no esc issues at time of inspection
|
General Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 | | PASS |
Andy J. Long
|
|
|
WIP on the north and east sides of the hospital. Parking lot DIs have filter protection. No corrections at this time.
|
General Inspection | 5/22/2014 | 5/22/2014 | 5/22/2014 | | PASS |
Andy J. Long
|
|
|
Addition and exterior work is complete. Electrical and interior work ongoing. Permit is posted. No corrections required at this time.
|
General Inspection | 4/21/2014 | 4/21/2014 | 4/21/2014 | | PASS |
Andy J. Long
|
|
|
The exterior of phase I of the TV Hospital is complete, but needs landscaping and final clean up. Parking lot DIs still have protection. North side phase II is in on going. No discharges or other violations observed.
|
General Inspection | 3/20/2014 | 3/20/2014 | 3/20/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No violations observed.
|
General Inspection | 2/17/2014 | 2/17/2014 | 2/17/2014 | | CANC |
Evan Jenkins
|
|
|
holiday
|
Conference | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PASS |
Andy J. Long
|
|
|
Jared Phone #: ###-####
Conference was called to discuss engineering changes to building's new stormwater drainage. Needs to be reviewed by PW Engineer. Provided contact info for Brian Murphy.
No ESC violations observed while on-site.
|
General Inspection | 12/17/2013 | 12/17/2013 | 12/17/2013 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. Parking lot storm drains have filter protection and stie has perimeter BMPs. No corrections at this time.
|
General Inspection | 11/13/2013 | 11/13/2013 | 11/13/2013 | | PASS |
Andy J. Long
|
|
|
BMPs implemented. No track out or other violations observed. Approved.
|
Random Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 | P | PASS |
Andy J. Long
|
|
|
Permit posted. BMPs in place include inlet protection for parking lot storm drains, perimeter wattles around areas of activity, and a dust screen fence. Nice site. Approved - was called out for phase II inspection, which has not yet begun; this permit covers phase I.
|
Site Preparation | 9/17/2013 | 9/17/2013 | 9/17/2013 | P | PASS |
Mike Jordan
|
|
|
charles Phone #: ###-####
|
Site Preparation | 9/12/2013 | 9/16/2013 | 9/16/2013 | P | CANC |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|