General Inspection | 6/13/2014 | 6/13/2014 | 6/13/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and stabilized. The DI bag at bottom of Woodcross has been cleaned/removed as requested. ESC conditions satisfied.
|
General Inspection | 5/13/2014 | 5/13/2014 | 5/13/2014 | | PASS |
Andy J. Long
|
|
|
BLD permit is finaled and house is occupied. Yard needs stabilization. Trackout at the neighboring site has been issued a correction notice.
|
General Inspection | 4/11/2014 | 4/11/2014 | 4/11/2014 | | PASS |
Andy J. Long
|
|
|
No violations observed. Landscaping and stabilization has not yet been installed.
|
General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 | | PART |
Evan Jenkins
|
|
|
some track out occuring. called rp left vm to sweep
|
General Inspection | 2/7/2014 | 2/7/2014 | 2/7/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. Exterior work is complete, interior work ongoing. No landscaping, driveway, or stabilization yet. No corrections required at this time.
|
General Inspection | 1/7/2014 | 1/7/2014 | 1/7/2014 | | PASS |
Andy J. Long
|
|
|
Construction entrance is being used, permit is posted. No corrections at this time.
|
General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 | | PASS |
Andy J. Long
|
|
|
Permit posted, no track out - construction entrance is effective. Putting in fence in between lot and canal access road. No corrections required at this time.
|
General Inspection | 10/31/2013 | 10/31/2013 | 10/31/2013 | | PASS |
Andy J. Long
|
|
|
Construction entrance was provided since last inspection. No violations at this time. WIP.
|
Conference | 9/26/2013 | 9/26/2013 | 9/26/2013 | P | DONE |
Andy J. Long
|
|
|
RP Jason returned called. Utility trench is open at the moment for inspection purposes. Extra pit run (rock) is stockpiled (observed during inspection) to reestablish construction entrance once trench is backfilled. He will replace DI protection and restrict access until construction entrance can be repaired.
|
General Inspection | 9/20/2013 | 9/20/2013 | 9/26/2013 | | FAIL |
Evan Jenkins
|
|
|
CN issued to RP via phone. Clean up track out and replace drop inlet protection. Address changes to construction entrance, workers using alternate entrance with no BMP installed.
|
Conference | 8/9/2013 | 8/12/2013 | 8/13/2013 | P | PART |
Kimberly M. Johnson
|
|
|
Jason- Please call 30 min before going out Phone #: ###-####. Meet at 2:30 8/12. Called to reschedule until after perimeter gets installed on south side -8/12. Re-inspected 8/13: Still need to review approved ESC plan; berm looks good but needs extended to the east around the stockpile and to the west to capture runoff from the makeshift channel along property line. Noted existing illicit washout south of the existing disturbance around the wellhead - Note this is not from current construction.
|
Site Preparation | 8/12/2013 | 8/12/2013 | 8/12/2013 | P | PART |
Kimberly M. Johnson
|
|
|
sign up. entrance in. excavator started already. Need perimeter control on south side to protect canal. Called RP to reschedule conference until after this gets installed.
|