Site Final | 8/21/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Jim Sly
|
|
|
Larry
|
DOC - Permit Finaled | 8/21/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 7/24/2013 | 7/24/2013 | 7/25/2013 | P | PART |
Kimberly M. Johnson
|
|
|
Larry###-####. Performed inspection 7/24 PM and work had started before permit was issued. Had signage up. Discussed with RP to protect inlets. Performed Re-inspection 7/25 AM and trenching contractor brought in straw wattle around down gradient side of trench stockpile however it only laying on the ground and is not staked or trenched in. Straw wattle isn't neccessary for this project. Installed one DI BMP down gradient of work but needs the second DI protected that is located to the east prior to trenching for Jbox electrical connection
|