Site Final | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | DONE |
Evan Jenkins
|
|
|
mike Phone #: ###-#### see final
|
DOC - Permit Finaled | 3/26/2014 | 3/26/2014 | 3/26/2014 | P | PASS |
Evan Jenkins
|
|
|
Landscaping Perfored Backyard Hydroseeded No ESC Issues Complete
|
Aging Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | | PASS |
Evan Jenkins
|
|
|
Building appears complete Back yard needs Final Stabilization. Permit posted on fence, no ESC Issues at time of inspection
|
Site Preparation | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | PASS |
Kimberly M. Johnson
|
|
|
Seperate demo permit. RP must post new ESC sign (sign is on site). No other BMPs neccessary to pass site prep. Washout and stabilized entrance need to go in prior to pour.
|