General Inspection | 12/6/2013 | 12/6/2013 | 12/6/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 12/6/2013 | 12/6/2013 | 12/6/2013 | P | PASS |
Andy J. Long
|
|
|
House complete, landscaped, and occupied. Other permits already finaled.
|
General Inspection | 11/5/2013 | 11/5/2013 | 11/5/2013 | | PASS |
Andy J. Long
|
|
|
Exterior construction is mostly complete. Not yet stabilized. No track out or other ESC violations observed at time of inspection.
|
General Inspection | 9/26/2013 | 9/26/2013 | 9/26/2013 | | PASS |
Andy J. Long
|
|
|
Permits posted. DI protection on MS4. Site is well kept with no track out observed after rainfall.
|