DOC - Permit Finaled | 6/17/2014 | 6/17/2014 | 6/17/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 | | PASS |
Andy J. Long
|
|
|
Dentist office is complete and occupied. The permit and Guho construction sign is still on site on the adjacent parcel. Parking lot and drainage facility improvements complete. Cleared parcel is 665 Parkcenter and looks to be prepped for furture development. Graded and stabilized with gravel. No further ESC inspections required.
|
General Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/17/2014 | 3/17/2014 | 3/17/2014 | | PASS |
Andy J. Long
|
|
|
Contractor doing good keeping sediment on site. Area disturbance surrounded by chainlink fence and wattles where necessary. Approved.
|
General Inspection | 1/28/2014 | 1/28/2014 | 1/28/2014 | | PASS |
Evan Jenkins
|
|
|
Construction in Progress. No ESC issues at time of inspection
|
General Inspection | 12/10/2013 | 12/10/2013 | 12/13/2013 | | NR |
Eric Strole
|
|
|
|