Permit Information
Permit NumberESC13-00649
StatusFinaled
Name OLIVER STEIGER
Site Address 601 W GOWEN RD
Project NameWPS Warehouse Expansion
Customer Number 
ePlanReviewNo
Description
Expand existing warehouse to the south. Demo existing metal end wall and add new insulated tilt-up warehouse with ESFR sprinkler system and suspended ceiling for in rack storage including tires. Extend existing metal building to the west attaching it to main builidng creating one structure of 247,539 SF.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/25/20148/25/20148/25/2014 PASS
DetailsAndy J. Long
Landscaping is in progress. WPS office space expansion is complete.

Permit still open and to be finaled upon landscaping/stabilization of bare ground.
DOC - Permit Finaled8/25/20148/25/20148/25/2014PPASS
DetailsAndy J. Long
Construction on south end warehouse expansion is complete and stabilized. BLD open pending Fire inspection.

ESC conditions satisfied.
General Inspection7/8/20147/8/20147/8/2014 PASS
DetailsAndy J. Long
General Inspection5/20/20145/20/20145/20/2014 PASS
DetailsAndy J. Long
WIP. No corrections at this time. Frame of warehouse addition is complete, further site work at WPS on-going
General Inspection4/4/20144/4/20144/4/2014 PASS
DetailsAndy J. Long
WIP. See activity notes for ESC13-00650.
General Inspection2/17/20142/17/20142/17/2014 CANC
DetailsEvan Jenkins
holiday
General Inspection12/31/201312/31/201312/31/2013 PASS
DetailsAndy J. Long
Warehouse construction in progress. Permits on-site, BMPs installed. No track out to Gowen Road.
General Inspection11/14/201311/14/201311/14/2013 PASS
DetailsAndy J. Long
WIP. BMPs in acceptable condition. No trackout to Gowen or WPS access road.
General Inspection9/27/20139/27/20139/27/2013 PASS
DetailsAndy J. Long
BMPs properly installed. No track out. No MS4 in area. Site is well kept