General Inspection | 11/19/2013 | 11/19/2013 | 11/19/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Andy J. Long
|
|
|
4-plex is complete, landscaped, and occupied. All other permits finaled. No ESC issues for this site. Vertical construction and site development is on going at Aberdeen Place with open ESC permits.
|
General Inspection | 10/2/2013 | 10/2/2013 | 10/2/2013 | | PASS |
Andy J. Long
|
|
|
Active construction on going at this site in Aberdeen Place. RP Pat was onsite and provided weekly inspection reports and SWPPP for the development. No ESC violations. Approved.
|