General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 | | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes.
|
DOC - Permit Finaled | 12/4/2013 | 12/4/2013 | 12/4/2013 | P | PASS |
Andy J. Long
|
|
|
Patio and trellis are complete and surrounding area stabilized, BMP removed from stormwater DIs. Permit still posted, BLD pending P&Z. ESC permit conditions satisfied.
|
General Inspection | 10/4/2013 | 10/4/2013 | 10/4/2013 | | PASS |
Andy J. Long
|
|
|
Work in progress. Site is contained. Permit was not posted, so I had RP fill out permit and post. This was completed during inspection. Approved. Construction should be finished by next week.
|