General Inspection | 8/25/2014 | 8/25/2014 | 8/25/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PASS |
Andy J. Long
|
|
|
RSD warehouse and office is complete and landscaped. All construction materials removed, Mitchell culdesac is free of sediment from site. ESC conditions satisfied.
|
General Inspection | 7/8/2014 | 7/8/2014 | 7/8/2014 | | PASS |
Evan Jenkins
|
|
|
North Staging Area of project was recently hydroseeded. once 70% of vegetation growth occurs, ESC Permit will be closed
|
Random Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Andy J. Long
|
|
|
RSD warehouse is near complete. Parking lot and drainage infrastructure installed. Will need to stabilize the staging area south of the parking lot. Mitchell Streets looks recently swept and MS4 has protection.
|
Tracking Control | 4/10/2014 | 4/10/2014 | 4/10/2014 | P | PART |
Evan Jenkins
|
|
|
Complaint from Public Works MOST TRACK OUT HAS BEEN ADDRESSED, BUT CONTACTED MIKE MORE 8695833 TO EXPLAIN COMPLAINT. HE STATED HE WILL GET THE AREA SWEPT UP TODAY
|
General Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Andy J. Long
|
|
|
No corrections at this time. Stockpiles stored in low risk area with barriers to MS4. Construction entrance is satisfactory.
|
General Inspection | 1/17/2014 | 1/17/2014 | 1/17/2014 | | CANC |
Andy J. Long
|
|
|
Cancelled due to meeting obligations. Rescheduled for Tuesday 1/21/2014
|
General Inspection | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 11/6/2013 | 11/8/2013 | 11/8/2013 | A | PASS |
Andy J. Long
|
|
|
Constructrion entrance has been improved as requested and road was swept. Site is in compliance.
|
Complaint Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | A | CANC |
Andy J. Long
|
|
|
duplicate entry
|
Random Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 | | PART |
Andy J. Long
|
|
|
Permits posted. SWPPP on site. BMPs include permiter wattles, DI protetection, restricted site access, and construction entrance.
Correction required: 1. Complete construction entrance all the way to road. 2. Sweep up track out on Mitchell
RP notified by phone. Reinspection scheduled for Friday.
|
Site Preparation | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | PART |
Mike Jordan
|
|
|
duncan Phone #: ###-####. Construction enterance established, ESC permit sign has been posted with SWPPP at construction enterance. BMP's installed. Noted that waddles do not overlap at ends. SPoke to RP and idaho sand and gravel. They will check with Syman on install and correct if needed. Earth moving operations have begun.
|