Permit Information
Permit NumberESC13-00747
StatusFinaled
Name DUNCAN GOUNDRY
Site Address 423 N MITCHELL ST
Project NameRSD Warehouse & Showroom
Customer Number 
ePlanReviewNo
Description
Construction of a 26,300 GSF single story concrete tilt-up industrial building to house 1-2 tenants consisting of warehouse, sales and office space. Includes site development of a 2.31 acre site.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/25/20148/25/20148/25/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled8/25/20148/25/20148/25/2014PPASS
DetailsAndy J. Long
RSD warehouse and office is complete and landscaped. All construction materials removed, Mitchell culdesac is free of sediment from site. ESC conditions satisfied.
General Inspection7/8/20147/8/20147/8/2014 PASS
DetailsEvan Jenkins
North Staging Area of project was recently hydroseeded. once 70% of vegetation growth occurs, ESC Permit will be closed
Random Inspection5/20/20145/20/20145/20/2014APASS
DetailsAndy J. Long
RSD warehouse is near complete. Parking lot and drainage infrastructure installed. Will need to stabilize the staging area south of the parking lot. Mitchell Streets looks recently swept and MS4 has protection.
Tracking Control4/10/20144/10/20144/10/2014PPART
DetailsEvan Jenkins
Complaint from Public Works
MOST TRACK OUT HAS BEEN ADDRESSED, BUT CONTACTED MIKE MORE 8695833 TO EXPLAIN COMPLAINT. HE STATED HE WILL GET THE AREA SWEPT UP TODAY
General Inspection3/25/20143/25/20143/25/2014APASS
DetailsMike Jordan
General Inspection3/11/20143/11/20143/11/2014 PASS
DetailsEvan Jenkins
General Inspection1/17/20141/21/20141/21/2014APASS
DetailsAndy J. Long
No corrections at this time. Stockpiles stored in low risk area with barriers to MS4. Construction entrance is satisfactory.
General Inspection1/17/20141/17/20141/17/2014 CANC
DetailsAndy J. Long
Cancelled due to meeting obligations. Rescheduled for Tuesday 1/21/2014
General Inspection12/2/201312/2/201312/2/2013PPASS
DetailsMike Jordan
Tracking Control11/6/201311/8/201311/8/2013APASS
DetailsAndy J. Long
Constructrion entrance has been improved as requested and road was swept. Site is in compliance.
Complaint Inspection11/7/201311/8/201311/8/2013ACANC
DetailsAndy J. Long
duplicate entry
Random Inspection11/7/201311/7/201311/7/2013PPASS
DetailsMike Jordan
General Inspection11/6/201311/6/201311/6/2013 PART
DetailsAndy J. Long
Permits posted. SWPPP on site. BMPs include permiter wattles, DI protetection, restricted site access, and construction entrance.

Correction required:
1. Complete construction entrance all the way to road.
2. Sweep up track out on Mitchell

RP notified by phone. Reinspection scheduled for Friday.
Site Preparation9/16/20139/17/20139/17/2013APART
DetailsMike Jordan
duncan Phone #: ###-####. Construction enterance established, ESC permit sign has been posted with SWPPP at construction enterance. BMP's installed. Noted that waddles do not overlap at ends. SPoke to RP and idaho sand and gravel. They will check with Syman on install and correct if needed. Earth moving operations have begun.