Site Final | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Andy J. Long
|
|
|
All lots in EC#7 are complete/occupied except for two. These lots will be covered seperately when constructed.
No further grading, subdivision work, or stabilization remaining. ESC permit conditions satisfied. ESC permits for phase #8 & #9 are active.
|
Aging Inspection | 6/19/2017 | 6/19/2017 | 6/19/2017 | | PASS |
Melissa Jannusch
|
|
|
Subdivision has several vacant lots. DI bags are still in the stormdrains.
|
Aging Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 2/14/2017 | 2/14/2017 | 2/15/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | PASS |
Andy J. Long
|
|
|
1 SFH in progress by Canyon Crest. No subdivision work occuring. No muddy runoff down gutter or from open parcels. Approved.
|
Aging Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/23/2016 | 8/23/2016 | 8/24/2016 | P | PASS |
Andy J. Long
|
|
|
SFHs in progress. Developer conducting DI bag maintenance and providing lined washout on Arrow Villa. Individual homes on Bent Bow are in compliance.
|
General Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on SFHs. DI's on Bent Bow have sediment filter bags; individual SFHs in decent condition. DI bags have been maintained. Concrete washout located down below in Eyrie Canyon #8.
|
General Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | P | PART |
Andy J. Long
|
|
|
Verbal correction request to designate responsiblity of changing out DI bags. Developer stated he will have his ESC crew do it instead of Canyon Crest.
|
General Inspection | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | PART |
Andy J. Long
|
|
|
WIP on SFHs on Bent Bow in EC #7. Lined concrete washout pit is located at bottom of hill on Arrow Villa.
Correction request to developer and Canyon Crest Homes:
-all DI bags on Bent Bow need to be emptied out and reisntalled.
No other corrections. Hillsides well vegetated. Individual projects are mostly clean.
|
General Inspection | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | PART |
Andy J. Long
|
|
|
Correction needed on Eyrie Canyon #7:
- conduct maintenance on sediment filter bags on Bent Bow, at or greater than 50% capacity. - pick up any windblown trash or unused material on open lots.
Verbal correction issued to Jill.
|
Aging Inspection | 4/4/2016 | 4/4/2016 | 4/4/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/30/2015 | 11/30/2015 | 11/30/2015 | | PART |
Evan Jenkins
|
|
|
SIgnificant trackout coming off of SFH project located at 2198 Bent Bow. Will contact RP to get swept up this morning.
|
Aging Inspection | 9/28/2015 | 9/28/2015 | 9/28/2015 | | PASS |
Evan Jenkins
|
|
|
|
Aging Inspection | 7/27/2015 | 7/27/2015 | 7/27/2015 | | PART |
Evan Jenkins
|
|
|
Sweep Sidewalks, Sweep streets again after last large rain fall
|
Aging Inspection | 5/25/2015 | 5/25/2015 | 5/26/2015 | | PASS |
Evan Jenkins
|
|
|
|
Aging Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | | PASS |
Andy J. Long
|
|
|
2 SFHs with seperate permits in progress on Bent Bow with Eerie Canyon #7. Drop inlets have inlet protection. Hillsides that were seeded last year are stabilized and no hillside erosion is occuring.
No corrections required at this time.
|
Aging Inspection | 1/19/2015 | 1/19/2015 | 1/20/2015 | | PASS |
Evan Jenkins
|
|
|
|
Aging Inspection | 11/17/2014 | 11/17/2014 | 11/17/2014 | | PASS |
Andy J. Long
|
|
|
Home near completion. Workers parking on street to prevent trackout of mud. Snow has not yet started to melt. No ESC issues detected. Permit posted.
|
General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 | | PASS |
Andy J. Long
|
|
|
No activity at Eyrie Canyon #7 phase at time of inspection. Bent Bow is in good condition; hillsides behind parcels are well vegetated.
No corrections necessary at time. Will keep montioring hillside conditions for upcoming wet season.
|
Aging Inspection | 7/15/2014 | 7/15/2014 | 7/15/2014 | | PASS |
Evan Jenkins
|
|
|
Road has been paved. Drop inlet protection installed. Vegetation growing well on steep hillsides. very little on baren lots. Road is clean
|
Aging Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 | | PART |
Evan Jenkins
|
|
|
Trackout occuring onto bent bow. Contractors preping for Paving. Contractor will sweep roads
|
General Inspection | 3/14/2014 | 3/17/2014 | 3/17/2014 | A | PASS |
Evan Jenkins
|
|
|
colin Phone #: ###-#### Stop Work Order Lifted Today. Talked w/ Collin Connel via cell to keep ESC as a high priority, and if they're is any runnoff, all work to cease and perform clean up, more BMP installation and maintenance. he agreed
|
Conference | 2/12/2014 | 2/12/2014 | 2/12/2014 | P | DONE |
Evan Jenkins
|
|
|
Notice of Violation issued. Met onsite with ACHD Luke Robertson for a witness. Called Colin Connell at 3:02pm to have him meet me up onsite. He did not answer his phone, so I left him a voicemail to meet me up on Bent Bow Dr. at 3:30pm for a Conference Notice of Violation Was Served to Colin Connel at 3:40pm. ACHD was a witness to this issue. Notice of Violation: Stop Turbid Discharge from Leaving Site, and Correctly Install Permiter BMP's (Construction Entrance) by 5:00pm tomorrow 2-13-14 or Criminal Citation/Fines will be applied. Colin Signed this NOV
|
BMP Violation | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | FAIL |
Evan Jenkins
|
|
|
Eyrie Canyon #7 BMP violation STOP WORK ORDER ISSUED: Lack of BMP Maintenance, BMP's Inadequate for Slopes, Severe Turbid Discharges occuring throughout site. MS4 Severely Impacted with Heavy Sedimentation, Sidewalk, curb and Right-of-Way all impacted with Sediment. Took Photos and Sending them to Jenifer and Andy. Collin stated there will be no work occuring on this site for 2 weeks. I told him NO WORK shall take place, until violations are corrected, Reinspection approval Required prior to the Lift of Stop Work Order
|
BMP Violation | 1/30/2014 | 1/31/2014 | 2/3/2014 | P | PART |
Evan Jenkins
|
|
|
last inspection to ensure compliance is achieved or stop work order shall be issued Clean up still needs performed 1-31-14
|
BMP Violation | 1/29/2014 | 1/30/2014 | 1/30/2014 | A | PART |
Evan Jenkins
|
|
|
Reinspection to see whether violations have been addressed, fixed and site to be cleaned up. Reinspection fee will be assessed. CONTRACTOR CURRENTLY PERFORMING CLEANUP AND INSTALLING BMP'S. WILL Reinspect tomorrow 1-31-14 at 1:00pm for given deadline.
|
BMP Violation | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | FAIL |
Evan Jenkins
|
|
|
eyrie problems Significant Amount of Sediment leaving various areas of the site into ACHD ROW and MS4. Met with Colin onsite, with one of his subs. He began installing gravel check dams. He is to install construction entrance, more Perimeter BMP's along sidewalks and clean out the Drop Inlet. Once things dry up, he shall sweep entire Bent Bow Road, curbs and sidewalks.
|
Conference | 1/13/2014 | 1/14/2014 | 1/14/2014 | A | DONE |
Andy J. Long
|
|
|
Met RP/developer Colin Connel with Evan and ACHD eerosion inspector.
Meeting discussed corrections to be made at end of Bent Bow and perimeter. Lots that have been graded but do not have current construction activity permits will be accomplished by Wood River and Canyon Crest whom own some of the individual sites.
Contractors have been given several days to have BMPs delivered and installed. Sweeping and DI bag clean out will be addressed today.
|
Complaint Inspection | 1/13/2014 | 1/13/2014 | 1/13/2014 | P | FAIL |
Andy J. Long
|
|
|
Complaint called to Evan Jenkins. Evan and I inspected site. Sediment has washed into street and MS4 due to lack of BMPs installed at downslopes and perimeters.
Corrections: 1. Clean up sediment on sidewalks and streets 2. Replace DI bags 3. Install BMPs in affected areas 4. Need to stablize open lots with hydroseed or mulch 5. A conference will be scheduled.
|
General Inspection | 1/8/2014 | 1/8/2014 | 1/8/2014 | | CANC |
Evan Jenkins
|
|
|
Due to snow weather and slick steep road, cannot make it to the location in company car
|
BMP Violation | 11/6/2013 | 11/7/2013 | 11/7/2013 | P | FAIL |
Evan Jenkins
|
|
|
Met onsite with RP Collin and ACHD Jason Korn to address trackout and bmp violations. Collin stated he will replace drop inlet bags and sweep road by tomorrow afternoon. WIll start today. Will reinspect tomorrow 11-8-13 in afternoon
|
General Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 | | FAIL |
Evan Jenkins
|
|
|
Called Collin Connell to discuss issues with lack of BMP Maintanence. He stated it was from a water truck. Sweep Sediment off sidewalk, roads, remove witches hats and replace new or clean bmp. redo construction entrance
|
Site Preparation | 8/28/2013 | 8/29/2013 | 8/30/2013 | A | PASS |
Tony Young
|
|
|
Colin Phone #: ###-####
|