DOC - Permit Finaled | 3/11/2014 | 3/11/2014 | 3/11/2014 | P | PASS |
Andy J. Long
|
|
|
Matress Firm is complete. BLD permit already finaled. Disturbed area is now stabilized and landscaped. ESC conditions satisfied.
|
General Inspection | 3/11/2014 | 3/11/2014 | 3/11/2014 | | PASS |
Andy J. Long
|
|
|
|
Tracking Control | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Andy J. Long
|
|
|
Parking lot and drive thru area have been cleaned as requested during previous inspections. Site is back in compliance. Mainly interior work remaining on project.
|
General Inspection | 1/22/2014 | 1/22/2014 | 1/22/2014 | | PART |
Andy J. Long
|
|
|
Addition is complete, interior work is on going. Stairs have been installed to Emerald. No sediment leaving site, but need to sweep up the drive thru lane and front parking spaces. DI protection is still installed.
|
General Inspection | 12/6/2013 | 12/6/2013 | 12/6/2013 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | PASS |
Andy J. Long
|
|
|
doug Phone #: ###-####
Discussed project and site with RP Doug, who was onsite. DI protection on MS4 on Emerald, cement curbing lines East and North of activity. Wattles are on-site to line perimeter once footing for addition are added. Permit posted in store window. Once addition is added, stairway to Emerald will be installed with wattles on grassy bank. Approved for construction to commence.
|