DOC - Permit Finaled | 10/11/2013 | 10/11/2013 | 10/11/2013 | P | PASS |
Andy J. Long
|
|
|
Finaled.
|
Site Final | 10/10/2013 | 10/10/2013 | 10/11/2013 | P | PASS |
Andy J. Long
|
|
|
Roger called for reinspection of stabilization. Plot has been reseeded and graded to allow growth. No construction materials or debris remaining on site. Approved. No further ESC inspections required. BLD permit is open but was contigent on ESC conditions, so should also be finaled. Called Roger to confirm approval.
|
Site Preparation | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PART |
Andy J. Long
|
|
|
Discussed stabilization with RP Roger. He will begin either mulch or hydroseed in the area of disturbance later this week. After re-inspection and approval the BLD and ESC permit may be finaled and the bond released
|