Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC13-00835
StatusFinaled
Name SHANE JAYO
Site Address 559 W MESA GRANDE LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Per attached ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/24/20147/24/20147/24/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled7/24/20147/24/20147/24/2014PPASS
DetailsAndy J. Long
House complete and landscaped. ESC conditions satisfied. BLD permit also finaled.
General Inspection6/23/20146/23/20146/23/2014 PASS
DetailsEvan Jenkins
Landscapers currently installing pressurized sprinkler system. Vegetation still needs established. Baren Ground/soils
no issues
General Inspection5/22/20145/22/20145/22/2014 PASS
DetailsAndy J. Long
No changes to site. House complete, not yet stabilized/landscaped. No sediment leaving parcel.
General Inspection4/21/20144/21/20144/21/2014 PASS
DetailsAndy J. Long
House complete and BLD finaled. Appears to be occupied.but yard is not landscaped or stabilized. Will check status on next general inspection.
General Inspection3/21/20143/21/20143/21/2014 PASS
DetailsAndy J. Long
House near completion. Needs landscaping and final stabilization. No corrections required at this time.
General Inspection2/18/20142/18/20142/18/2014 PART
DetailsAndy J. Long
Driveway was just installed. No discharges from site. Clement used makeshift washout at other end of site. Will need to have a more permanent washout area.
General Inspection1/15/20141/15/20141/15/2014 PASS
DetailsAndy J. Long
No violations at this time. Requested no offstreet parking allowed.
General Inspection12/13/201312/13/201312/13/2013 PASS
DetailsAndy J. Long
Washout in adajacent lot has been removed as requested. Permit posted, BMPs installed. No corrections at this time.
BMP Violation11/12/201311/12/201311/12/2013APART
DetailsAndy J. Long
Follow-up inspection- Corrections made:

1. Wattles installed per ESCP
2. DI bag was replaced and new bag installed
3. Gravel bag check dams placed in gutter

Deficiences:
1. No trash container provided
2. Foundation is poured but no wash out provided. Improper washout in next lot is not maintained and does not have construction entrance and will cause more track out..

New corrections:
1. Clean up/remove cement washout; or provide adequate BMPs for use.
General Inspection11/8/201311/8/201311/8/2013 FAIL
DetailsAndy J. Long
Corrections:

1. Clean up cement washout and use washout as described in site ESCP

2. Sweep street and surrounding gutters

3. Empty/replace existing DI filter bag

4. Repair down hill silt fences

Written correction notice left on site.