Site Final | 10/24/2013 | 10/24/2013 | 10/24/2013 | A | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Andy J. Long
|
|
|
Site final confirmed by Mike Jordan who completed BLD final 10/24
|
General Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/23/2013 | 8/23/2013 | 8/23/2013 | P | PASS |
Mike Jordan
|
|
|
###-#### Lyle
|