General Inspection | 9/1/2014 | 9/1/2014 | 9/3/2014 | | CANC |
Andy J. Long
|
|
|
holiday
|
DOC - Permit Finaled | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Andy J. Long
|
|
|
ESC conditions satisified for Hollywood Market Yoga. BLD open for drainage issue. Area is landscaped and stabilized.
|
General Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Hollywood Market yoga is near completion. Filtrex wattles have been removed since the outdoor patio is now complete and surround by waist high stucco wall. No trackout or discharges to street observed. Approved.
|
General Inspection | 4/29/2014 | 4/29/2014 | 4/29/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection Permit still posted on window of Yoga Building
|
General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 | | PASS |
Andy J. Long
|
|
|
Permit posted. Exterior work mostly finished. Fiber wattles contain loose dirt. No corrections required.
|
General Inspection | 12/24/2013 | 12/24/2013 | 12/24/2013 | | CANC |
Andy J. Long
|
|
|
rescheduled for 12/26
|
Site Preparation | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | PART |
Evan Jenkins
|
|
|
Tim Phone #: ###-#### Post Construction Signage (Contractor had it with him) Protect DI infront of the building on 8th st.
|