General Inspection | 11/3/2014 | 11/3/2014 | 11/3/2014 | | PASS |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 11/3/2014 | 11/3/2014 | 11/3/2014 | P | PASS |
Evan Jenkins
|
|
|
project complete: revegetation re-estblished via lanscaping/sod
|
General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 | | PASS |
Andy J. Long
|
|
|
Aviation Specialties is going through finishing touches on parking lot and interior work. Grounds have been landscaped and the parking lot paved. No corrections necessary.
|
Random Inspection | 7/29/2014 | 7/29/2014 | 7/29/2014 | P | PASS |
Andy J. Long
|
|
|
Aeronica street is free of trackout or sediment accumulation; Aviation Specialties parking lot will soon be paved and project near completion.. No corrections needed at this time.
|
Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Andy J. Long
|
|
|
Site development is near completion at Aviation Specialties. New curbs and sidewalks are currently being installed so there is some minor trackout onto Aeronica St. No discharge or other violations observed. Just needs standard house-cleaning. Vertical construction covered under ESC13-00345.
|
General Inspection | 6/9/2014 | 6/9/2014 | 6/9/2014 | | PASS |
Andy J. Long
|
|
|
Warehouse is erected. Construction area enclosed by security fencing and curbing. No track out or sediment observed leaving site. Approved.
|
General Inspection | 4/22/2014 | 4/22/2014 | 4/22/2014 | | PASS |
Andy J. Long
|
|
|
Hangar is now erected, all grading/hauling activities complete so less risk of track out. Stormdrains have DI protection, gutter and Aeronica street are clean. No corrections.
|
General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 | | PASS |
Evan Jenkins
|
|
|
No corrections needed at time of inspection
|
Tracking Control | 1/15/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Andy J. Long
|
|
|
Check to see if road in front of site is swept and construction entrance replenished.
Road was swept 1/15 as requested. Some sediment and sand from winter road service remains, but is improved.
Construction entrance turned over and refilled.
Discussed schedule with RP Mark and Riley in job trailer. Permit posted and washouts in use.
|
General Inspection | 1/15/2014 | 1/15/2014 | 1/15/2014 | | FAIL |
Andy J. Long
|
|
|
Two corrections:
1. Replenish construction entrance 2. Sweep street in front of site.
Talked to RP Mark on phone, they will make changes starting today. Reinspection scheduled for Friday AM.
|
General Inspection | 11/28/2013 | 11/28/2013 | 11/29/2013 | | CANC |
Evan Jenkins
|
|
|
Holiday
|
Site Preparation | 9/23/2013 | 9/24/2013 | 9/23/2013 | A | PASS |
Andy J. Long
|
|
|
Mark Phone #: ###-####
BMPs installed per ESC plan. Plan and permit available in jobsite trailer. Site is approved for construction.
|