Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC13-00925
StatusFinaled
Name RYAN JULIAN
Site Address 8021 S SNOW BIRD AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/12/20149/12/20149/12/2014PPASS
DetailsAndy J. Long
Sunny Ridge Pool is complete and surrounding area stabilized.
General Inspection8/4/20148/4/20148/4/2014 PASS
DetailsEvan Jenkins
General Inspection6/16/20146/17/20146/17/2014PPASS
DetailsAndy J. Long
Pool area at Sunny Ridge is near completion. Sod has been placed around the outside permiter and the parking lot is complete. Some minor work remaining on pool.
General Inspection6/16/20146/16/20146/16/2014 CANC
DetailsAndy J. Long
rescheduled for Tuesday 6/17
General Inspection4/29/20144/29/20144/29/2014 PASS
DetailsEric Strole
General Inspection3/12/20143/12/20143/12/2014 FAIL
DetailsAndy J. Long
Correction Notice:'

1. Provide trash container, wind is blowing trash.
2. Clean up concrete waste from the pool work.

No trackout or other violations. Notice posted.
General Inspection1/22/20141/22/20141/22/2014 FAIL
DetailsEvan Jenkins
Escessive Track out/Sediment on Sidewalks, and street. Called RP Ryan to state violations and to get everything swept and cleaned up. he stated he will get a couple guys out right away to get back in compliance. I asked Ryan to give me a call back when they get area addressed, so I can verify the tasks were performed tomorrow
General Inspection12/5/201312/5/201312/5/2013 FAIL
DetailsAndy J. Long
Maintenance of BMPs and house-keeping is required.

Corrections:

1. Replenish/maintain construction entrance (s)
2. Sweep road and sidewalk directly in front of the project.

Called RP Ryan and discussed corrections and provided verbal correction notice. Clean up will begin this afternoon and Friday, reinspection will occur Monday.