General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 | | PASS |
Andy J. Long
|
|
|
BLD permit has been finaled, but yard is not yet stabilized or landscaped. ESC permit conditions are not yet satisfied, but there no corrections required at this time.
|
BMP Violation | 1/27/2014 | 1/29/2014 | 1/29/2014 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 1/22/2014 | 1/22/2014 | 1/27/2014 | | FAIL |
Eric Strole
|
|
|
Spoke with RP and need to clean-up all dirt and debris off sidewalks, street and gutter pans by 1-28-14 PM. Will reinspect on 1-29-14 AM.
|
General Inspection | 12/5/2013 | 12/5/2013 | 12/5/2013 | | PASS |
Andy J. Long
|
|
|
Met with site foreman Brett, DI bags in front of site have been emptied as requested. No erosion at back of site, and BMPs are installed. Some track out on street, daily sweeping needs to take place which was discussed. Brett contact # ###-####. Can be called as well as Wood Bros.
|
Site Preparation | 10/15/2013 | 10/15/2013 | 10/15/2013 | P | PART |
Evan Jenkins
|
|
|
Kristy Phone #: ###-#### Install straw wattle along north side of project to protect Canal. Sweep Street, install waddle along sidewalk
|