DOC - Permit Finaled | 8/28/2014 | 8/28/2014 | 8/28/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 | | PASS |
Andy J. Long
|
|
|
Home complete. All permits finaled. ESC conditions satisfied.
|
General Inspection | 7/28/2014 | 7/28/2014 | 7/28/2014 | | PASS |
Evan Jenkins
|
|
|
Yard needs re-vegetation no other esc issues at time of inspection
|
General Inspection | 6/26/2014 | 6/26/2014 | 6/26/2014 | | PASS |
Andy J. Long
|
|
|
Permits posted in north facing window. No sediment leaving site, yard has large curbing around it. No corrections at this time.
|
General Inspection | 5/26/2014 | 5/26/2014 | 5/28/2014 | | CANC |
Evan Jenkins
|
|
|
hoiday
|
General Inspection | 4/23/2014 | 4/24/2014 | 4/24/2014 | A | PASS |
Andy J. Long
|
|
|
Permit posted. BMPs installed. No trackout to Talavera; concrete washout in use. Approved.
|
General Inspection | 4/23/2014 | 4/23/2014 | 4/23/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for 4/24
|
General Inspection | 3/21/2014 | 3/21/2014 | 3/21/2014 | | PART |
Andy J. Long
|
|
|
Permit posted. Wattle installed along fence by canal. Excavation/foundation conducted earlier this week with out site prep. No other corrections
|
General Inspection | 2/18/2014 | 2/18/2014 | 2/18/2014 | | PASS |
Andy J. Long
|
|
|
No construction/excavation yet. No ESC issues.
|
General Inspection | 1/16/2014 | 1/16/2014 | 1/16/2014 | | PASS |
Andy J. Long
|
|
|
No activity, project hasn't started.. Lots are at end of Talavera by canal.
|
General Inspection | 12/13/2013 | 12/13/2013 | 12/13/2013 | | PASS |
Andy J. Long
|
|
|
No activity. Project has not started yet.
|