DOC - Permit Finaled | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Andy J. Long
|
|
|
Exterior work is complete, yard is landscaped/stabilized. BLD still open for remaining interior work. Numerous open ESC permits adjacent to site. No further inspections for this home.
|
Aging Inspection | 9/10/2014 | 9/10/2014 | 9/10/2014 | | PASS |
Andy J. Long
|
|
|
Landscaping and interior work remaining. WIP. Approved.
|
Aging Inspection | 7/11/2014 | 7/11/2014 | 7/11/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Starting on frame. Keeping sidewalk and road free of sediment and construction materials. No corrections.
|
Site Preparation | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Berms between lots keeping sediment on block. Alley is clean; washout has remaing capacity. Permit has been posted. Approved for excavation.
|
Site Preparation | 12/6/2013 | 12/6/2013 | 12/6/2013 | P | PASS |
Andy J. Long
|
|
|
|