Permit Information
Permit NumberESC13-00970
StatusFinaled
Name JUSTIN REYNOLDS
Site Address 2822 S HOLDEN LN
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/24/20149/26/20149/29/2014PPASS
DetailsAndy J. Long
Outstanding fees paid. ESC permit conditions satisfied.
DOC - Permit Finaled9/29/20149/29/20149/29/2014PPASS
DetailsAndy J. Long
Site Final9/22/20149/24/20149/24/2014APASS
DetailsAndy J. Long
compliance date extended by 1 day

Corrections at Tianna Park have been completed to satisfaction. Just need to pay the reinspection fee by Friday.
Site Final9/19/20149/23/20149/22/2014ACANC
DetailsAndy J. Long
Tianna Park site final. Check if fees have been paid to final.

Re-inspection moved to Wednesday morning 9/24
BMP Violation9/19/20149/19/20149/19/2014PPART
DetailsAndy J. Long
DI protection has been removed as requested. Just need to clean up around inlet.

Inspection associated with Tianna Park violations by Sunrise Homes.

2nd Correction Notice:

1. Clean leaves, debris, sediment in and around sand window swales.
2. Re-install construction fencing around swales and check that the Gatorguard wattles are properly installed/staked in.
3. Pick up all dried concrete chunks around Sunrise home sites and adjacent lot.
4. Pick up and contain all litter and waste construction materials and contain with trash bin
5. Finish sweeping sediment around sites, collect tiles/dust and dispose of properly.

Re-inspection fee $46.31 applied to permit. Payment due next week so that site can be finaled.

NOTE: If ALL corrections are not complete by Tuesday 9/23, a SWO will be issued on active homesites in Tianna Park until completion.
Aging Inspection9/16/20149/16/20149/16/2014 FAIL
DetailsAndy J. Long
Observations at Tianna Park:

1. No removal of drop inlet bag in first sectionas requested multiple times. Now full of leaves and sediment. Needs removal.

2. Trash, debris, and sediment deposited in poorly protected drainage swale.

3. Sediment from both active Sunrise homes is uncontained and all over access road.

4. Very little attention or consideration to keeping a clean site.

Actions:

Fail inspections for both active sites. Will reinspect Friday morning. If no changes will issue second Correction Notice to Sunrise and begin to proceed with Stop Work Orders.

See ESC14-00163, 00160, 00556, 00583 for Sunrise Homes in Tianna Park that are in similiar condition as mentioned in this inspection.
Site Final7/16/20147/23/20147/22/2014PFAIL
DetailsAndy J. Long
See if DI bag and tarp protecting swale have been removed as requested. Home construction is complete.

No corrections made. No response from RP. 2nd notice given to Justin from Sunrise.
Aging Inspection7/16/20147/16/20147/16/2014 PART
DetailsAndy J. Long
Construction is complete.

2 corrections:

1. Remove DI bag filter next to house
2. Remove tarp on top of small swall next to Holden.

Site final schedule for next Wednesday 7/23 to see if corrections have been made. VM left to RP Justin.
Aging Inspection5/16/20145/16/20145/16/2014 PASS
DetailsAndy J. Long
Site Preparation10/14/201310/15/201310/15/2013APASS
DetailsEvan Jenkins
Justin Phone #: ###-####
BMP's Installed, Sand Windows Protected.
Stop Work Order Removed
Site Preparation10/11/201310/11/201310/11/2013PFAIL
DetailsEvan Jenkins
Justin Phone #: ###-####
BMP's still not in place
Stop Worker still in Effect
Site Preparation10/10/201310/10/201310/10/2013PFAIL
DetailsEvan Jenkins
Justin Phone #: ###-####
Stop Work order place on adjacent permited lot. No BMP's currently in place.
Talked with Justin via in person and via cellphone. EJ