Site Final | 9/22/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 9/1/2014 | 9/1/2014 | 9/3/2014 | | PASS |
Andy J. Long
|
|
|
project near completion anticipate next inspection, the permit will be finaled
|
General Inspection | 7/31/2014 | 7/31/2014 | 7/31/2014 | | PASS |
Andy J. Long
|
|
|
Tripplett Ranch townhome on west end is near completion. No corrections - washout is being utilized, no trackout to Millet, no dust issues, and trash is contained. Approved.
|
General Inspection | 6/30/2014 | 6/30/2014 | 6/30/2014 | | PASS |
Andy J. Long
|
|
|
Townhome second from west end of Millet access road. Trash being kept in container, washout provided for development, and permit posted. No trackout to main street of Millet. Approved.
|
General Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Two townhomes under construction on both sites. BMPs installed. Approved.
|