Site Final | 10/28/2013 | 10/29/2013 | 10/29/2013 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 10/29/2013 | 10/29/2013 | 10/29/2013 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | CANC |
Jim Sly
|
|
|
Jerry phone
|
Site Preparation | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | CANC |
Jim Sly
|
|
|
Jerry phone
|
Site Preparation | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Andy J. Long
|
|
|
JERRY Phone #: ###-####
Talked with RP to review conditions. Permit is posted and site is ready for construction.
|