Aging Inspection | 9/29/2014 | 9/29/2014 | 9/29/2014 | | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. Sunrise Homes GC stated he was en route to pay fees issued for non-compliance on two Tianna Park parcels.
|
DOC - Permit Finaled | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 7/29/2014 | 8/1/2014 | 8/1/2014 | P | NR |
Andy J. Long
|
|
|
|
Site Final | 7/24/2014 | 7/29/2014 | 7/29/2014 | P | NR |
Andy J. Long
|
|
|
Tianna Park - check swale and DI bag removal
|
BMP Violation | 7/22/2014 | 7/24/2014 | 7/24/2014 | P | CANC |
Andy J. Long
|
|
|
Sunrise development in Tanna Park. Need to remove DI bag and clean up swale.
Post signs on active projects.
RP/GC Justin called to schedule site final for next Tuesday 7/29 because swale will be cleaned and DI bag will be removed. No other violations or active construction next to swale and DI bag, so compliance time is acceptable.
|
Aging Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | | PART |
Andy J. Long
|
|
|
Need to clean up swale and trash in front of house along Holden. Construction is complete.
|
Aging Inspection | 5/20/2014 | 5/20/2014 | 5/20/2014 | | PART |
Andy J. Long
|
|
|
No discharges or trackout to Holden and Boise Ave. Need to improve housekeeping on access street and driveway. Vertical construction complete, interior work and landscaping remaining.
|