Site Final | 9/19/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 | | PASS |
Andy J. Long
|
|
|
Near completion. No violations observed. Millet street is free of trackount and drainage swale is protected by silt fence and vegetation. Needs landscaping/stabilization and final cleanup.
|
General Inspection | 8/4/2014 | 8/4/2014 | 8/4/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/3/2014 | 7/3/2014 | 7/3/2014 | | PASS |
Andy J. Long
|
|
|
Triplett townhomes in progress. No trackout or sediment accumulation in gutter. Washout in good condition with more capacity. Approved.
|
General Inspection | 6/2/2014 | 6/2/2014 | 6/2/2014 | | PASS |
Andy J. Long
|
|
|
Foundation is complete, vertical constrution has not yet started. Permit posted. Tripplett townhouse subdivision in good condition. Witnessed cement truck using the designated and lined washout pit.
|
General Inspection | 4/30/2014 | 4/30/2014 | 4/30/2014 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 3/27/2014 | 3/28/2014 | 3/28/2014 | A | PART |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Duplicate site prep request. Site prep completed 3/21.
Correction: 1. More rock for washout access 2. Construction entrance to stockpile area or increased sweeping.
|
Site Preparation | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | PASS |
Andy J. Long
|
|
|
clint Phone #: ###-####
Permit posted. BMPs installed. No construction yet. Approved.
|