Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberESC13-01006
StatusFinaled
Name CLINT WALL
Site Address 5734 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Per attached ESC conditions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/19/20155/19/20155/19/2015PDONE
DetailsPhil Shearer
DOC - Permit Finaled5/19/20155/19/20155/19/2015PPASS
DetailsPhil Shearer
General Inspection5/13/20155/13/20155/13/2015 PASS
DetailsEvan Jenkins
WIP: Interior.
No ESC issues at this time
General Inspection4/28/20154/28/20154/28/2015 PASS
DetailsAndy J. Long
WIP on townhome. Needs landscaping and final site clean up. No spills or discharges observed. Approved.
General Inspection4/13/20154/13/20154/13/2015 PASS
DetailsAndy J. Long
WIP on townhome. Frame is up. Interior work occuring at time of inspection. Permit posted, trash container provided. Site needs landscaping, stabilization and final cleaning.
General Inspection3/27/20153/27/20153/27/2015 PASS
DetailsAndy J. Long
General Inspection3/12/20153/12/20153/12/2015 PASS
DetailsAndy J. Long
Townhome is near completion. Access street is fairly clean, no discharges, spills or dirt moving into grassy swale or tracking out to Millet.

No corrections required.
General Inspection2/25/20152/25/20152/25/2015 PART
DetailsAndy J. Long
WIP on townhome.

Correction request to RP Clint to have street swept at end of the week and to repair sections of damaged silt fence protecting grassy swale. Some sections may be removed since about 70 % of townhomes are complete.
General Inspection2/10/20152/10/20152/10/2015 PASS
DetailsAndy J. Long
General Inspection1/26/20151/26/20151/26/2015 PASS
DetailsAndy J. Long
WIP. Permit posted. Tripllet townhomes' BMPs are installed. Access road has been recently swept. No trackout to Millet. Approved.
Tracking Control1/9/20151/9/20151/9/2015PFAIL
DetailsAndy J. Long
Trackout on multiple lots at Tripplett Ranch townhomes.

Notified Clint they should have sweeper service after the 3 active homesite have the foundations installed. No trackout to main road (Millet) or stormwater discharge.
General Inspection12/29/201412/29/201412/29/2014 PASS
DetailsAndy J. Long
WIP, Frozen ground, no discharges. Trash and materials are contained. BMPs installed at Tripplet townhomes. Approved.
General Inspection12/12/201412/12/201412/12/2014 PASS
DetailsEvan Jenkins
General Inspection11/27/201411/27/201411/28/2014 CANC
DetailsEvan Jenkins
holiday
General Inspection11/12/201411/12/201411/12/2014 PASS
DetailsAndy J. Long
Site has been prepped/graded for foundation. No sediment runoff or trackout. Tripplett Ranch townhomes are in progress, no non-stormwater discharges or trackout to Millet. Swale is protected and no hillside erosion occuring. WIP.
Site Preparation10/28/201410/28/201410/28/2014PPASS
DetailsAndy J. Long
Clint Phone #: ###-####

Permit posted. Tripplet Ranch BMPs are in good working order. No violations on active townhome projects. Approved for excavation.