Site Final | 10/24/2014 | 10/24/2014 | 10/24/2014 | A | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Phil Shearer
|
|
|
|
Site Preparation | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | PASS |
Andy J. Long
|
|
|
Clint ###-####
Permit is posted. Spoke with Clint about Tahoe projects. Washouts are being used, and sidewalks/streets are being kept clean. Approved.
|