Permit Information
Permit NumberESC13-01040
StatusFinaled
Name SHANE JAYO
Site Address 2072 N PAINTED ROCK LN
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/10/201410/10/201410/10/2014 PASS
DetailsAndy J. Long
Construction complete. SFH is occupied and landscaped. Somerset Village is in good condition with no BMP failures or significant trackout.
DOC - Permit Finaled10/10/201410/10/201410/10/2014PPASS
DetailsAndy J. Long
General Inspection9/9/20149/9/20149/9/2014 PASS
DetailsAndy J. Long
Home is complete and BLD permit has been finalied. Yard is on hillside and needs stabilization/landscaping to meet ESC permit conditions. No sediment runoff or other violations; will keep open until stabilization.
General Inspection8/8/20148/8/20148/8/2014 PASS
DetailsEvan Jenkins
General Inspection7/8/20147/8/20147/8/2014 PASS
DetailsEvan Jenkins
no esc issues at time of inspection
General Inspection6/6/20146/6/20146/6/2014 PASS
DetailsAndy J. Long
WIP. No violations. Somerset Village in good condition at time of construction.
General Inspection5/6/20145/6/20145/6/2014 PASS
DetailsAndy J. Long
Roofers and framers on site. Contractors staying off open areas. No violations observed.
General Inspection4/4/20144/4/20144/4/2014 PASS
DetailsEvan Jenkins
General Inspection3/4/20143/4/20143/4/2014 PART
DetailsAndy J. Long
No trackout or other significant violations, but no permit visibly posted at site. Left new permit onsite with permit details.
Tracking Control1/28/20141/29/20141/29/2014APART
DetailsEvan Jenkins
follow up with BMP violations: no construction signage, significant trackout w/ sediment leaving site
--1-29-14: Streets were somewhat swept, construction sign still not posted. If construction sign isn't posted by next regular inspection, STOP WORK ORDER WILL be Issued
General Inspection1/28/20141/28/20141/28/2014 FAIL
DetailsEvan Jenkins
No Construction Sign Posted. No Site Prep Inspection prior to earth disturbance. Significant amount of sediment leaving the site via ASV. Called RP Shane Jayo to describe the violations and to get them address/fixed by this afternoon due to expected rains tonight and tomorrow. He stated he will have the area cleaned up and sign posted. Will follow up tomorrow