General Inspection | 5/13/2014 | 5/13/2014 | 5/13/2014 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | PASS |
Andy J. Long
|
|
|
Loading yard has been paved and stormwater system installed. No futher construction activities observed. BLD permit is open. No ESC violations; no further inspections required.
|
General Inspection | 3/12/2014 | 3/12/2014 | 3/12/2014 | | PASS |
Andy J. Long
|
|
|
No construction acivity. Project is not yet complete. Permit posted. No violations observed.
|
General Inspection | 1/9/2014 | 1/9/2014 | 1/9/2014 | | PASS |
Andy J. Long
|
|
|
Paving project and new loading dock construction is not yet complete. No violations observed. Permit is posted. No MS4 or surface waters in vicinity.
|
Site Preparation | 11/6/2013 | 11/6/2013 | 11/6/2013 | P | PASS |
Andy J. Long
|
|
|
jeff ###-####
Permit posted. No MS4 structures in surrounding area. Will just need to monitor track out. Approved for construction
|