General Inspection | 5/9/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Andy J. Long
|
|
|
Finaled. See activity notes for details.
|
DOC - Permit Finaled | 5/12/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Andy J. Long
|
|
|
Pool is installed and no further construction. Remaining ESC corrections and stabilization of the site will be covered under the house permit ESC13-00213 (BLD13-00042)
|
General Inspection | 5/9/2014 | 5/9/2014 | 5/9/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for Monday 5/12
|
General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 | | CANC |
Evan Jenkins
|
|
|
PER NOTES: NO INSPECTION AT THIS TIME
|
General Inspection | 3/4/2014 | 3/4/2014 | 3/4/2014 | | PART |
Evan Jenkins
|
|
|
Contacted RP Dave HIcks 991.8578 and left voicemail describing the amount of sediment that was discharged offsite due to the rains. A month ago, Andy, myself and Dave met onsite to discuss hydroseeding and BMP maintenance. One reccomendation I made, was to place gravel check dams on gullys on each side of road to slow velocity of runnoff and get the sediment to drop out. These were not installed, so significant amount of erosion took place on each side of the driveway, discharging into ACHD's right-of-way. Also a drop inlet/grate was not protected, so there is alot of sediment deposited in inlet. Sweeping needs to take place, and check dams installed. Disclosed this via VM left with Dave.
|
General Inspection | 1/29/2014 | 1/29/2014 | 1/29/2014 | | PASS |
Andy J. Long
|
|
|
Hillside stabiliization is holding up through precipitation. No sediment laden runoff flowing to Castello. No corrections required at this time.
|
General Inspection | 12/25/2013 | 12/25/2013 | 12/26/2013 | | CANC |
Evan Jenkins
|
|
|
Holiday
|