DOC - Permit Finaled | 10/13/2014 | 10/13/2014 | 10/13/2014 | P | PASS |
Andy J. Long
|
|
|
BLD finaled end of August. Home is occupied and has been landscaped with areas of sod and hydroseeding. Orange wattle below retaining wall may remain until hydroseeding is fully grown. Bond in place to ensure hillside remains stable and erosion issues do not occur.
ESC permit conditions satisfied.
|
General Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 | | PASS |
Evan Jenkins
|
|
|
waiting for re-vegetation establishment practices to achieve the required 80% above native background vegetation
|
General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 | | PASS |
Andy J. Long
|
|
|
Home is near completion and multiple retaining walls are installed. No rill or hillside erosion, topsoil has been placed and landscaping should occur soon. Heavy duty wattle is still installed at bottom of site and edge of disturbance. Permit posted.
|
General Inspection | 8/4/2014 | 8/4/2014 | 8/4/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/4/2014 | 7/4/2014 | 7/7/2014 | | CANC |
Andy J. Long
|
|
|
holiday
|
General Inspection | 6/3/2014 | 6/3/2014 | 6/3/2014 | | PASS |
Andy J. Long
|
|
|
Staying within designated area of disturbance and downslope wattle is trenched in. No trackout. House is framed, driveway is not yet paved.
|
General Inspection | 4/30/2014 | 4/30/2014 | 4/30/2014 | | PASS |
Evan Jenkins
|
|
|
no issues at time of inspection
|
General Inspection | 3/28/2014 | 3/28/2014 | 3/28/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 2/25/2014 | 2/25/2014 | 2/25/2014 | P | PASS |
Andy J. Long
|
|
|
heather Phone #: ###-####
Site set up per ESC plan except for construction access. This will be installed by excavator upon start of clearing/digging. Approved. Discussed plans with RP Heather.
|